EVALUASI UNJUK KERJA TRAFO BERPENDINGIN MINYAK BHT03 DI RSG–GAS

Asep Saepuloh, AS and Koes Indrakoesoema, KI and Yuyut Suraniyanto, YS (2006) EVALUASI UNJUK KERJA TRAFO BERPENDINGIN MINYAK BHT03 DI RSG–GAS. Buletin "Reaktor". ISSN ISSN: 0216-2695

[thumbnail of 1asep.pdf]
Preview
Text
1asep.pdf

Download (509kB) | Preview

Abstract

EVALUASI UNJUK KERJA TRAFO BERPENDINGIN MINYAK BHT03 DI RSG–GAS. Pengujian kekentalan minyak menjadi skala prioritas pada perawatan sebuah trafo. Pengujian kadar minyak pada transformator (trafo) berpendingin minyak BHT03 telah dilakukan dimana hasil pengukuran rata-rata 29 kV/2,5 cm yang mengindikasikan bahwa kadar minyak sudah menurun. Setelah dilakukan proses purifikasi, yaitu menghilangkan kadar uap air pada minyak sehingga kekentalannya menjadi seperti semula, kadar minyak trafo diukur melalui tegangan tembusnya dimana setelah melalui 3 (tiga) kali pengukuran menunjukkan rata-rata 87 kV/2,5 cm. Harga ini masih melebihi dari batas yang disyaratkan, yaitu berdasarkan standar dari PT. PLN  80 kV/2,5 cm [1]. Dengan hasil tegangan tembus tersebut, minyak trafo yang berfungsi sebagai pendingin belitan trafo dapat mencegah terjadinya hubung singkat dan kinerja trafo sebagai fungsi penurun tegangan 20 kV/400 V di RSG-GAS berjalan dengan baik.

ABSTRACT

THE PERFORMANCE EVALUATION OF TRANSFORMER OIL TYPE BHT03 AT RSG-GAS. The examination of oil viscosity must be priority of a transformer maintenances. The examination of oil transformer of oil type BHT03 in RSG-GAS has been done where are measured result the average is 29 kV/2,5 cm in this indication so oil viscosity after down. After done purification which used to elimination water from oil is used to reach the viscosity like before. Degree of oil is measured via the breakdown voltage and after three time measurement, the average is 87 kW/2,5 cm which is much higher then the requirement according standard from PT. PLN  80 kV/2,5 cm [1]. Oil transformer to use cooling of winding transformer also used to prevent short circuit and as function of performance of step-down 20 kV/400 V can good connection.

Item Type: Article
Subjects: Taksonomi BATAN > Reaktor Nuklir > Teknologi Reaktor > Sistem Reaktor
Taksonomi BATAN > Reaktor Nuklir > Teknologi Reaktor > Sistem Reaktor
Divisions: BATAN > Pusat Reaktor Serba Guna
IPTEK > BATAN > Pusat Reaktor Serba Guna
Depositing User: Administrator Repository
Date Deposited: 04 Feb 2019 03:33
Last Modified: 31 May 2022 03:42
URI: https://karya.brin.go.id/id/eprint/8541

Actions (login required)

View Item
View Item