PEMBUATAN PANEL OTOMATIS SISTEM PENYEDIA AIR DINGIN PADA VENTILASI ZONA RADIASI MENENGAH RSG-GAS

Kiswanto, Kiswanto and Teguh Sulistyo, TS (2016) PEMBUATAN PANEL OTOMATIS SISTEM PENYEDIA AIR DINGIN PADA VENTILASI ZONA RADIASI MENENGAH RSG-GAS. Prosiding Seminar Nasional Teknologi dan Aplikasi Reaktor Nuklir. ISSN 976-602-6423-00-9

[thumbnail of 25-KISWANTO.pdf]
Preview
Text
25-KISWANTO.pdf

Download (545kB) | Preview

Abstract

PEMBUATAN PANEL OTOMATIS SISTEM PENYEDIA AIR DINGIN PADA VENTILASI ZONA RADIASI MENENGAH RSG-GAS. Telah dibuat panel otomatis sistem penyedia air dingin pada ventilasi zona radiasi menengah RSG-GAS dengan cara memasang sensor thermostat pada jalur pipa air masuknya. Ruang lingkup dan langka kerja yang dilakukan terdiri atas mempelajari cara kerja sistem lama, membuat gambar rancangan panel baru, membuat dan merakit panel kontrol serta melakukan uji fungsi panel tersebut. Dari hasil uji fungsi dengan menggunakan mode basic chiller menunjukkan bahwa pada suhu <11,5◦C chiller yang beroperasi 1 unit, pada suhu 11,5˚C sampai dengan 13,5˚C chiller yang beroperasi 2 unit dan pada suhu >13,5˚C chiller yang beroperasi 3 unit. Dengan beroperasinya lampu indikator yang terpasang pada panel kontrol dan beroperasinya ke tiga chiller pada saat uji fungsi berlangsung menunjukkan bahwa panel otomatis sistem penyedia air dingin pada ventilasi zona radiasi menengah RSG-GAS siap digunakan untuk mendukung operasi sistem ventilasi zona radiasi menengah RSG-GAS secara otomatis
Kata kunci: panel otomatis, sistem penyedia air dingin RSG-GAS, zona radiasi rendah RSG-GAS
ABSTRACT
AUTHOMATICAL PANEL ESTABLISMENT OF COOLING WATER PROVIDER IN THE VENTILATION SYSTEM OF INTERMEDIATE RADIATION ZONE OF THE GA. SIWABESSY REACTOR. It has been established automatical panel of chilled water supply system in the intermediate radiation zone of the RSG-GAS ventilation system. It has been done by installing a thermostat sensor in the entry of water pipe lines. The scope and steps of work done consists of studying how the old system, making the plans for the new panel, making and assembling the control panel and running test of the panel. From the results of the running test using basic mode chiller shows that at temperatures <11,5◦C chiller that operates is one unit, at temperatures of 11,5˚C to 13,5˚C chiller that operates are two units while at temperatures > 13 5˚C chiller that operates are 3 units. By the operation of the indicator lights that are mounted in the control panel and the operation of three chillers at the time of the running test shown that the automated panel water supply system is ready to be used to support the operation of the intermediate ventilation system radiation zone of the RSG-GAS.
Keywords: automatic panel, cold water supply system, radiation zone intermediate ventilation RSG-GAS

Item Type: Article
Subjects: Taksonomi BATAN > Reaktor Nuklir > Teknologi Reaktor > Instrumentasi dan Kendali Reaktor
Taksonomi BATAN > Reaktor Nuklir > Teknologi Reaktor > Instrumentasi dan Kendali Reaktor
Divisions: BATAN > Pusat Reaktor Serba Guna
IPTEK > BATAN > Pusat Reaktor Serba Guna
Depositing User: Administrator Repository
Date Deposited: 30 Oct 2018 01:17
Last Modified: 31 May 2022 04:44
URI: https://karya.brin.go.id/id/eprint/4153

Actions (login required)

View Item
View Item