PENGEMBANGAN RANCANG BANGUN UNTAI UJI DESALINASI MVC (TAHAP II) : FABRIKASI UNIT EVAPORASI/KONDENSASI DAN RANCANGAN PEMANAS AWAL Geni Rina Sunaryo, Puradwi Ismu Wahyono

Geni Rina Sunaryo, GRS and Puradwi I, Pur (2004) PENGEMBANGAN RANCANG BANGUN UNTAI UJI DESALINASI MVC (TAHAP II) : FABRIKASI UNIT EVAPORASI/KONDENSASI DAN RANCANGAN PEMANAS AWAL Geni Rina Sunaryo, Puradwi Ismu Wahyono. In: Prosiding Presentasi Ilmiah Teknologi Keselamatan Nuklir IX ISSN No. 1410-0533, 25 Februari 2004, Pusat Teknologi dan Keselamatan Reaktor Nuklir.

Full text not available from this repository.

Abstract

ABSTRAK
PENGEMBANGAN RANCANG BANGUN UNTAI UJI DESALINASI MVC (TAHAPII): FABRIKASI UNIT EVAPORASI/KONDENSASI DAN RANCANGAN PEMANAS AWAL. Empat modul evaporasi/kondensasi yang dapat dirangkai seri ataupun parallel dari unit desalinasi MVC telah difabrikasi. Setiap modul terdiri dari 29 tubes SS 304 dimana jarak antara lempeng penyangga satu dengan yang lainnya adalah 1,7m. Rancangan tersebut dibuat berdasarkan perhitungan proses desalinasi MVC secara keseluruhan yang hasilnya telah dipublikasikan sebelumnya. Selain itu juga telah diselesaikan rancangan pemanas awal atau preheater yang terdiri dari 3 pintu; destilat, brine dan air laut masukan. Berdasarkan hasil perhitungan diperoleh bahwa panjang pipa total yang dibutuhkan untuk luaran destilat dan brine dengan diameter luar 16 mm dan tebal 1,2 mm adalah 24 dan 150 m.
Kata kunci : Mechanical Vapor Compression
ABSTRACT
DESIGN ENGINEERING DEVELOPMENT OF EXPERIMENTAL MVC DESALINATION INSTALLATION (PART II): MANUFACTURING EVAPORATION/CONDENSATION UNIT AND DESIGNING PREHEATER. The four modules of evaporator/condensor that can be installed serial or parallel of MVC desalination has been fabricated. Each module is consisted by 29 Stainless steel tubes, where the distance between the plates is 1,7m. This design has been based on the overall calculation of the process of MVC (Mechanical Vapor Compression) desalination that has been published previously. Beside that, the design on preheater that consist of 3 flow for destilate, brine and input seawater has been done. Based on the calculation, it is known that the required total length of tube with outer diameter of 16mm and thickness of 1.2mm is 24 and 150, respectively.
Keywords : Mechanical Vapor Compression

Item Type: Conference or Workshop Item (Paper)
Subjects: Taksonomi BATAN > Keselamatan dan Keamanan Nuklir
Taksonomi BATAN > Keselamatan dan Keamanan Nuklir
Divisions: BATAN > Pusat Teknologi dan Keselamatan Reaktor Nuklir
IPTEK > BATAN > Pusat Teknologi dan Keselamatan Reaktor Nuklir
Depositing User: Administrator Repository
Date Deposited: 23 Apr 2020 01:54
Last Modified: 31 May 2022 03:47
URI: https://karya.brin.go.id/id/eprint/9788