Djunaidi, Djunaidi and Andriyanto, Yayan (2004) PENYEDIAAN DAN PEMAKAIAN CATU DAYA DISEL PEMBANGKIT DI RSG-GAS. Buletin "Reaktor". ISSN ISSN: 0216-2695
Djunaidi-Vol 1.pdf
Download (312kB) | Preview
Abstract
PENYEDIAAN DAN PEMAKAIAN CATU DAYA DISEL PEMBANGKIT DI RSG-GAS. Telah dilakukan evaluasi terhadap penyediaan catu daya darurat dan pemakaiannya untuk kebutuhan listrik di RSG-GAS. Tujuan penulisan makalah ini adalah untuk mengetahui beban yang sebenarnya yang digunakan untuk keperluan catu daya operasi reaktor serta catu daya yang tersisa untuk dapat dimanfaatkan di tempat lain yang membutuhkan. Di RSG-GAS telah dipasang 3 buah disel pembangkit sebagai catu daya darurat. Dalam prosedur pengoperasiannya pada saat terjadi gangguan dari catu daya utama (PLN), 3 disel beroperasi secara otomatis dimana masing-masing mempunyai kapasitas terpasang sebesar 500 KVA. Pemakaian catu daya darurat dimulai sejak terjadinya gangguan yang dirasakan oleh RPS, dan sampai saat ini beban pemakaiannya terbatas pada kebutuhan beberapa sistem di reaktor, penerangan dan sistem ventilasi pada gedung reaktor. Dengan demikian catu daya darurat disel pembangkit ini masih memiliki sisa catu daya sebesar (BNA 61, 1%, BNB 48,9% dan BNC 56%) yang mungkin dapat dimanfaatkan di tempat lain yang membutuhkan seperti gedung OB.
Kata kunci : Catu daya disel pembangkit
ABSTRACT
READY AND USAGE RATION DIESEL POWER GENERATING IN RSG-GAS. The evaluated to ready ration power emergency and its usage for the requirement of electric in RSG-GAS. The purpose of this piper is to know burden which in fact which used for rationing power operate for reactor and also ration power which remain to be able to be exploited in other place requiring. RSG-GAS has been attached 3 generating diesel as rationing power emergency. In its operation procedure at the time of happened trouble from the best rationing power (PLN), 3 diesel operate automatically were severally have capacities attached equal to 500 KVA. The consumption ration power emergency started since the happening of trouble felt by RPS, and till now its usage burden limited to requirement some system reactor, ventilation system and lighting in the reactor building. Thereby this generating diesel power emergency still have remains ration power is (BNA 61, 1%, BNB 48,9% and BNC 56%) which possible can be exploited in other place requiring like operation building (OB).
Item Type: | Article |
---|---|
Subjects: | Taksonomi BATAN > Reaktor Nuklir > Pemanfaatan Reaktor > Kogenerasi Reaktor Daya Taksonomi BATAN > Reaktor Nuklir > Pemanfaatan Reaktor > Kogenerasi Reaktor Daya |
Divisions: | BATAN > Pusat Reaktor Serba Guna IPTEK > BATAN > Pusat Reaktor Serba Guna |
Depositing User: | Administrator Repository |
Date Deposited: | 19 Jun 2019 07:03 |
Last Modified: | 31 May 2022 03:47 |
URI: | https://karya.brin.go.id/id/eprint/9038 |