EVALUASI KONSUMSI DAYA LISTRIK RSG-GAS PADA SIKLUS OPERASI TERAS 58

Teguh Sulistyo, TS (2007) EVALUASI KONSUMSI DAYA LISTRIK RSG-GAS PADA SIKLUS OPERASI TERAS 58. Buletin "Reaktor". ISSN ISSN: 0216-2695

[thumbnail of 5_teguh.pdf]
Preview
Text
5_teguh.pdf

Download (381kB) | Preview

Abstract

EVALUASI KONSUMSI DAYA LISTRIK RSG-GAS PADA SIKLUS OPERASI TERAS 58. Telah dilakukan evaluasi konsumsi daya listrik pada siklus operasi RSG-GAS teras 58 tanggal 12 Juli 2006 sampai dengan 07 Nopember 2006 menggunakan data rekening listrik dan laporan operasi RSG-GAS teras 58 tahun 2006. Berdasarkan hasil evaluasi konsumsi daya listrik, beban LWBP (Lewat Waktu Beban Puncak) pada akhir sebesar 12.861, WBP (Waktu Beban Puncak) pada akhir sebesar 2.481, kVAR sebesar 12.977 sedangkan daya yang dibangkitkan sampai akhir teras LVI sebesar 641,1361 MWD (Mega Watt Day) dengan daya operasi umumnya sebesar 15 MW dengan waktu siklus operasi RSG-GAS teras 58 ini, 46,92 % dari waktu yang tersedia digunakan untuk operasi reaktor, sedangkan 53,08 % kondisi reaktor padam. Kondisi ini dipergunakan untuk beberapa kegiatan meliputi pembongkaran/pembentukan teras, persiapan sarana operasi, perawatan sistem instrumentasi, elektrik dan mekanik serta perbaikan sistem instrumentasi dan mekanik yang mengalami gangguan. Sehingga dari keseluruhan waktu operasi, 99,86 % digunakan pada operasi daya tinggi untuk kegiatan iradiasi target produksi radioisotop dan eksperimen, sedangkan 0,14 % digunakan pada operasi daya rendah untuk kegiatan eksperimen fisika pada awal siklus.

Kata Kunci: siklus operasi RSG-GAS

ABSTRACT

EVALUATION CONSUME POWER ELECTRICS RSG-GAS AT CYCLE OPERATE FOR TERRACE 58. Have evaluate to consumption of energy electrics at cycle operate for RSG-GAS terrace 58 12 July 2006 up to 07 November 2006 using electrics account data and report operate for RSG-GAS terrace; core 58 year 2006. Pursuant to result of evaluation consume electrics energy, burden of LWBP (Pass Time Peak Load/Burden) by the end of equal to 12.861, WBP (Time Peak Load/Burden) by the end of equal to 2.481, kVAr equal to 12.977 while awakened energy to the last terrace; core of LVI equal to 641,1361 MWD (Mega Watt of Day) with energy operate for generally equal to 15 MW with cycle time operate for RSG-GAS 58 terrace; core this, 46,92 % from time which is [is] available to be used for the operation of reactor, while 53,08 % condition of extinct reactor. This condition is utilized for a few activity cover unloading / forming of terrace; core, preparation of operation medium, treatment of instrumentation system, electrical and mechanic and also repair of instrumentation system and natural mechanic of trouble. So that from overall of operation time, 99,86 % used at high energy operation for the activity of goals irradiation produce experiment and radioisotope, while 0,14 % used at low energy operation for the activity of physics experiment in the early cycle.

Keyword: cycle operate for RSG-GAS

Item Type: Article
Subjects: Taksonomi BATAN > Reaktor Nuklir > Teknologi Reaktor > Instrumentasi dan Kendali Reaktor
Taksonomi BATAN > Reaktor Nuklir > Teknologi Reaktor > Instrumentasi dan Kendali Reaktor
Divisions: BATAN > Pusat Reaktor Serba Guna
IPTEK > BATAN > Pusat Reaktor Serba Guna
Depositing User: Administrator Repository
Date Deposited: 11 Mar 2019 07:46
Last Modified: 31 May 2022 03:38
URI: https://karya.brin.go.id/id/eprint/8826

Actions (login required)

View Item
View Item