EVALUASI UNJUK KERJA BATERE BTD01 PADA SISTEM UPS RSG-GAS SETELAH REFUNGSIONALISASI

Adin Sudirman, ASM (2007) EVALUASI UNJUK KERJA BATERE BTD01 PADA SISTEM UPS RSG-GAS SETELAH REFUNGSIONALISASI. Buletin "Reaktor". ISSN ISSN: 0216-2695

[thumbnail of 2_adin.pdf]
Preview
Text
2_adin.pdf

Download (271kB) | Preview

Abstract

EVALUASI UNJUK KERJA BATERE BTD01 PADA SISTEM UPS RSG-GAS SETELAH REFUNGSIONALISASI. Telah dilakukan refungsionalisasi sistem DC batere BTD01. Untuk mengetahui kehandalan dari sistem tersebut, telah dilakukan pengujian unjuk kerja dengan cara melakukan pemadaman catu utama (PLN) di panel BNA ruang 0924. Dengan pemadaman tersebut pasokan daya ke sistem UPS diambil alih oleh batere BTD01, yang kemudian di lakukan pengukuran tegangan, arus, suhu dan densitas air batere. Pengukuran dilakukan setiap 15 menit sebanyak 8 step, dan diperoleh hasil pengukuran tegangan 228 volt, arus 7,12 Amper, suhu 20 0¬¬C, densitas air 1,27 kg/l. Harga hasil pengukuran ini tidak ada perubahan yang signifikan. Ini terjadi akibat beban terpasang yang belum optimal (1,467 kVA) terhadap beban tersedia (20 kVA), sehingga harga pengukuran setelah tiga tahun beroperasi masih sama dengan hasil pengukuran pada saat awal batere BTD001 mulai dioperasikan. Sedangkan waktu pelepasan muatan (discharge) dengan beban 7,12 A adalah 21,067 jam

Kata kunci: unjuk kerja batere

ABSTRACT

PERFORMANCE EVALUATION OF BATTERY BTD01 AT RSG-GAS UPS SYSTEM AFTER REFUNCTIONALIZATION. The performance of battery BTD01 at RSG-GAS UPS system has been tested by switching off the main electrical power supply (PLN) in BNA panel, room 0924. By the switching of mention the power of reactor system was supply by that battery and then measuring of the voltage, current, temperature and liquid density of the battery was done. The measurement of voltage current, , temperature and density of battery were done every 15 minutes in 8 steps, and the results were 228 V, 7,12 A, 20 0C and 1,27 kg/l respectively. These remained constant compared to the measurements after three operation, while the discharge time for the load 7,12 A was 21,067 hours.

Key word: performance battery

Item Type: Article
Subjects: Taksonomi BATAN > Reaktor Nuklir > Teknologi Reaktor > Sistem Reaktor
Taksonomi BATAN > Reaktor Nuklir > Teknologi Reaktor > Sistem Reaktor
Divisions: BATAN > Pusat Reaktor Serba Guna
IPTEK > BATAN > Pusat Reaktor Serba Guna
Depositing User: Administrator Repository
Date Deposited: 05 Mar 2019 06:36
Last Modified: 31 May 2022 03:37
URI: https://karya.brin.go.id/id/eprint/8808

Actions (login required)

View Item
View Item