PENGARUH PEMADAMAN LAMPU-LAMPU BESAR TERHADAP KELEMBABABAN UDARA BALAI OPERASI

Slamet Wiranto, SW and Sriawan, Sriawan (2000) PENGARUH PEMADAMAN LAMPU-LAMPU BESAR TERHADAP KELEMBABABAN UDARA BALAI OPERASI. In: PROSIDING SEMINAR HASIL PENELITIAN P2TRR, PRSG - BATAN.

[thumbnail of 17 slamet wiranto.pdf]
Preview
Text
17 slamet wiranto.pdf

Download (210kB) | Preview

Abstract

PENGARUH PEMADAMAN LAMPU-LAMPU BESAR TERHADAP KELEMBABAN UDARA BALAI OPERASI. Pada saat tidak ada kegiatan, lampu-lampu besar balai operasi dimatikan. Karena penangkap kandungan air sistem ventilasi tidak bekerja optimal, tingkat kelembaban udara di balai operasi naik. Pada saat tertentu kenaikan tingkat kelembaban udara diruangan tersebut naik hingga melampaui harga batas yang diizinkan. Untuk menghindarkan hal tersebut perlu dilakukan penelitian dan kajian dengan cara mengukur dan mengevaluasi tingkat kelembaban dari berbagai kondisi dan situasi yang mungkin terjadi di Balai Operasi. Dari pengukuran dan kajian tersebut diperoleh karakteristik hubungan antara kelembaban udara dan pemadaman lampu-lampu besar di Balai Operasi sehingga bisa ditentukan bahwa kondisi normal adalah lampu-lampu besar Balai Operasi dimatikan, dan 2 hari sebelum reaktor start-up semua lampu penerangan balai operasi dinyalakan, kemudian dimatikan kembali setelah tingkat kelembaban kembali ke tingkat normal  5 hari setelah reaktor start-up.

ABSTRACT

THE INFLUENCE OF SWTTCHING-OFF THE BIG LAMPS ON THE HUMIDITY OPERATION HALL. When there is no activity in the Operation Hall, the big lamps in this are switched off. Due to the water trap of ventilation system is not in good function, the humidity of the Operation Hall increases. In any point of tim,e the humidity rise over the permitted limit value. To avoid this problem it is needed to investigate the characteristic by measuring the humidity of the Operatin Hall at various condition and situation. From the characteristic, it can be determined that for normal condition, the Operation Hall big lamps should be switched off, and 2 days before start-up reactor, the all operation building lamps should be switched on for about 5 days as the operation building humidity back to normal value.

Item Type: Conference or Workshop Item (Paper)
Subjects: Taksonomi BATAN > Reaktor Nuklir > Operasi dan Pemeliharaan Reaktor
Taksonomi BATAN > Reaktor Nuklir > Operasi dan Pemeliharaan Reaktor
Divisions: BATAN > Pusat Reaktor Serba Guna
IPTEK > BATAN > Pusat Reaktor Serba Guna
Depositing User: Administrator Repository
Date Deposited: 29 Jan 2019 07:13
Last Modified: 31 May 2022 04:03
URI: https://karya.brin.go.id/id/eprint/8494

Actions (login required)

View Item
View Item