Pardi, Pardi and Banyu RF, BRF (2018) EVALUASI PENANGANAN IRADIASI BATU TOPAZ PADA OPERASI REAKTOR SIKLUS 94 DAN 95. Buletin "Reaktor". ISSN ISSN: 0216-2695
pardi B5baru.pdf
Download (490kB) | Preview
Abstract
EVALUASI PENANGANAN IRADIASI BATU TOPAZ PADA OPERASI REAKTOR SIKLUS 94 DAN 95. Untuk memaksimalkan penggunaan reaktor RSG-GAS dalam memenuhi kepentingan pihak pengguna antara lain adalah melayani iradiasi target batu topaz saat reaktor operasi. Keandalan operasi reaktor perlu dijaga dan tingkatkan tanpa mengurangi faktor keselamatannya, salah satu keandalan operasi reaktor adalah kemampuan batang kendali pengatur (reg-rod) dalam mengimbangi perubahan reaktivitas di teras reaktor akibat gangguan dari pemasukan/penarikan target iradiasi. Reaktivitas, kecepatan, panjang langkah batang kendali pengatur (reg-rod) dan reaktivitas maksimum pada satu posisi iradiasi < 0,5% ditentukan dalam LAK , untuk penanganan iradiasi target batu topaz nilai reaktivitas sebesar ±0,0741% diperlukan kehati-hatian dengan membuat gerakan pemasukan/penarikan target sambil melihat kanal pemantau daya dan display daya digital. Pada makalah ini dilakukan evaluasi kegiatan penanganan target iradiasi batu topaz pada siklus operasi 94 dan 95, dengan menganalisis data kegiatan yang tercatat dalam buku induk operasi dan formulir iradiasi target batu topaz. Hasil evaluasi pada siklus operasi 94: iradiasi target topaz total sebanyak = 360 kali dengan massa total 324 kg dan pada siklus operasi 95: sebanyak = 576 kali dengan massa total 864 kg. Dalam mendukung radiasi target topaz tidak terjadi gangguan karena telah dilakukan analisis keselamatan terlebih dahulu serta pelaksanaan yang sesuai dengan SOP sehingga tidak mempengaruhi reaktivitas di teras begitu pula keselamatan radiasi untuk personil harus di jaga.
Kata kunci : evaluasi, penanganan target iradiasi batu topaz.
ABSTRACT
EVALUATION TOPAZ IRRADIATION HANDLING ON CORE OF 94 & 95 OPERATING REACTORS. The one of maximaze reactors RSG-GAS utilization to serve customer requirement is service irradiation topaz gemstone. Reliability of operating reactors have to guarded and without decrease safety factor, and one of Reliability of operating reactors is ability regulation control rod (reg-rod) to compensate changes in reactivity outcome enter/eject irradiation sample. Reactivity, rod speed, step length regulation control rod (reg-rod) and maximum reactivity at one radiation position <0,5% is listed in LAK. When handling topaz irradiation, reactivity value is ±0,0741% , is needed slow motion enter/eject target while looking measurement power channels and also digital power display. In this paper to evaluate topaz handling activities on the core of 94 & 95 operating reactors, by analyzing of data activities from book master operation and topaz irradiation target form. The evaluation result on core of operation 94 :irradiation topaz as much 360 times with total weight 324 kg and on core of operation 95 : irradiation topaz as much 576 times total weight 864 kg. Irradiation of topaz stones have no interruption because have been safety evaluated and also implementation in accordance with SOP so as very influential in reactor core, so as radiation safety personnel have to guarded.
Keywords: Evaluation, topaz handling activities on the core
Item Type: | Article |
---|---|
Subjects: | Taksonomi BATAN > Reaktor Nuklir > Operasi dan Pemeliharaan Reaktor > Operasi Taksonomi BATAN > Reaktor Nuklir > Operasi dan Pemeliharaan Reaktor > Operasi |
Divisions: | BATAN > Pusat Reaktor Serba Guna IPTEK > BATAN > Pusat Reaktor Serba Guna |
Depositing User: | Administrator Repository |
Date Deposited: | 29 Jan 2019 03:03 |
Last Modified: | 02 Jun 2022 03:17 |
URI: | https://karya.brin.go.id/id/eprint/8474 |