M. Nasir, MNR and Soedarjo, SDR and B.Dewi Arhatari, BDA and Andryansyah, ADR and Sriyono, SR and Mudi Haryanto, MH and Ari Triyadi, AT (2000) ANALISIS KERUSAKAN PIPA BOILER INDUSTRI. In: Prosiding Presentasi Ilmiah Teknologi Keselamatan Nuklir V, 28 Juni 2000, Prosiding Presentasi Ilmiah Teknologi Keselamatan Nuklir V P2TKN Serpong.
pros-natsir-2000a.PDF - Published Version
Restricted to Repository staff only
Download (0B)
Abstract
ABSTRAK
ANALISIS KERUSAKAN PIPA BOILER INDUSTRI. Telah dilakukan analisis
kerusakan pipa boiler Industri. Material pipa yang diuji adalah jenis baja karbon SA
178 Grade A berdasarkan data spesifikasi yang diperoleh dari Pabrik pupuk. Tahaptahap yang dilakukan dalam analisis meliputi ; Pengumpulan latar belakang sejarah
operasi dan spesifikasi bahan, pemeriksaan visual, uji dye penentrant, uji radiografi,
uji komposisi kimia, uji kekerasan dan uji metalografi. Dari hasil analisis dan
pengujian diketahui pipa tersebut mengalami penipisan ketebalan akibat erosi dan
pada bagian lasan terdapat cacat porositas dan penetrasi tak penuh. Penyebab
utama kerusakan pipa adalah erosi akibat kavitasi yang menyebabkan penipisan
pada dinding pipa. Penipisan ini pada akhirnya menyebabkan kebocoran pada
dinding pipa. Untuk mengatasi masalah ini, maka pipa tersebut harus diganti dengan
pipa yang baru.
ABSTRACT
FAILURE ANALYSIS OF INDUSTRIAL BOILER PIPE. Failure analysis of
industrial boiler pipe has been done. The tested pipe material is carbon steel SA 178
Grade A refer to specification data which taken from Fertilizer Company. Steps in
analysis were ; collection of background operation and material specification, visual
inspection, dye penetrant test, radiography test, chemical composition test,
hardness test, metallography test. From the test and analysis result, it is shown that
the pipe failure caused by erosion and welding was shown porosity and incomplete
penetration. The main cause of failure pipe is erosion due to cavitation, which
decreases the pipe thickness. Break in pipe thickness can be done due to
decreasing in pipe thickness.To anticipate this problem, the pipe will be replaced
with new pipe.
Item Type: | Conference or Workshop Item (Paper) |
---|---|
Subjects: | Taksonomi BATAN > Keselamatan dan Keamanan Nuklir Taksonomi BATAN > Keselamatan dan Keamanan Nuklir |
Divisions: | BATAN > Pusat Teknologi dan Keselamatan Reaktor Nuklir IPTEK > BATAN > Pusat Teknologi dan Keselamatan Reaktor Nuklir |
Depositing User: | Administrator Repository |
Date Deposited: | 20 Dec 2018 02:37 |
Last Modified: | 20 Dec 2018 02:37 |
URI: | https://karya.brin.go.id/id/eprint/7954 |