KAJIAN TERMOHIDROLIKA TERAS PLTN PWR DAN BWR TERHADAP KEJADIAN SBO MENGACU PADA KECELAKAAN FUKUSHIMA

Muhammad Subekti, MS (2011) KAJIAN TERMOHIDROLIKA TERAS PLTN PWR DAN BWR TERHADAP KEJADIAN SBO MENGACU PADA KECELAKAAN FUKUSHIMA. KAJIAN TERMOHIDROLIKA TERAS PLTN PWR DAN BWR TERHADAP KEJADIAN SBO MENGACU PADA KECELAKAAN FUKUSHIMA. pp. 130-141. ISSN 0854-2910

[thumbnail of 04_Memet-PTRKN_Kajian Termo-cd_new.pdf]
Preview
Text
04_Memet-PTRKN_Kajian Termo-cd_new.pdf

Download (223kB) | Preview

Abstract

ABSTRAK
KAJIAN TERMOHIDROLIKA TERAS PWR DAN BWR TERHADAP KEJADIAN SBO
MENGACU PADA KECELAKAAN FUKUSHIMA. Kecelakaan Fukushima menginisiasi
pembelajaran bagi jenis Pembangkit Listrik Tenaga Nuklir (PLTN) lainnya termasuk jenis Pressured
Water Reactor (PWR). Penyebab utama kecelakaan ini adalah station blackout (SBO) sehingga
sistem pendingin darurat pada teras, pemindah panas peluruhan, dan pengungkung bejana tidak
dapat berfungsi. Kajian dilakukan adalah untuk menggali hasil kajian, analisis serta pengalaman
operasi PLTN yang sudah dipublikasi jauh sebelum kecelakaan Fukushima terjadi. Kemudian kajian
ini juga melakukan verifikasi dengan data kecelakaan Fukushima untuk memperoleh pengetahuan
bagi pengembangan desain reaktor masa depan. Kajian menghasilkan kesamaan pola PWR dengan
BWR, dan menyimpulkan sebuah rekomendasi kecelakaan rekomendasi untuk melakukan
diversifikasi terhadap sistem pendingin darurat dan sistem generator diesel sehingga resiko
kegagalan heatsink utama berakibat pelelehan teras bisa diperkecil.
Kata kunci: SBO, pelelehan teras, kecelakaan Fukushima, PWR, BWR.
ABSTRACT
THERMALHYDRAULICS ASSESMENT OF PWR AND BWR CORES ON SBO EVENT
REFERING FUKUSHIMA ACCIDENT. Fukushima accident initiated lesson learning for any
other Nuclear Power Plant (NPP) types including Pressure Water Reactor (PWR) type. The main
cause of the accident is station blackout (SBO) so that the system for core emergency cooling, decay
heat removal, and vessel containment were fails to work. The assessment was done for exploring the
published result of the assessments, analysis, and NPP operation experiences a long time before
Fukushima accident happened. Furthermore, this assessment also carried out verification with
Fukushima accident data to expertise the knowledge for future reactor design development. The
assessment results accident pattern similarity of PWR with BWR’s one, summaries a
recommendation to carry out diversification for emergency cooling system as well as diesel
generator system so that the risk of ultimate heatsink failure effected to core melting, could be
decreased.
Keywords: SBO, core melting, Fukushima Accident, PWR, BWR

Item Type: Article
Subjects: Taksonomi BATAN > Keselamatan dan Keamanan Nuklir
Taksonomi BATAN > Keselamatan dan Keamanan Nuklir
Divisions: BATAN > Pusat Teknologi dan Keselamatan Reaktor Nuklir
IPTEK > BATAN > Pusat Teknologi dan Keselamatan Reaktor Nuklir
Depositing User: Administrator Repository
Date Deposited: 12 Nov 2018 09:00
Last Modified: 02 Jun 2022 02:23
URI: https://karya.brin.go.id/id/eprint/4930

Actions (login required)

View Item
View Item