ABSTRAK
Instalasi Pemurnian dan Konversi (Pilot Convertion Plant / PCP) adalah instalasi proses pembuatan yellow cake menjadi serbuk UO2. Pada awal proses instalasi pemurnian dan konversi, bahan baku yellow cake yang digunakan masih berupa batuan padat yang berasal dari hasil tambang. Untuk dapat di proses menjadi serbuk UO2, maka batuan yellow cake harus dihancurkan (crushing) dan diayak (sieving) sampai halus hingga terbentuk serbuk yellow cake dengan ukuran ≤ 5 mm. Penghancuran dan pengayakan batuan yellow cake ini di proses di seksi 100 pada Instalasi Pemurnian dan Konversi (PCP). Proses yang dilakukan semuanya berada didalam Glove Box (GB-101) agar tidak terjadi kontaminasi di ruang kerja. Didalam Glove Box 101 telah diatur tekanannya sesuai batas kondisi operasi (BKO) sebesar -5 mmH2O sampai dengan -15 mmH2O menggunakan pressure switch pneumatic. Penghancuran (crushing) yellow cake pada seksi 100 menggunakan Jaw Crusher (FC-101) dan pengayakan (sieving) menggunakan Vibrosieve (V-101). Hasil dari proses ini adalah sebuk yelow cake berukuran ≤ 5 mm sehingga siap dikirim seksi 300 untuk dilakukan pelarutan menggunakan asam nitrat pekat. Dari analisa proses pengoperasian alat penghancuran dan pengayakan yellow cake, bahwa ada beberapa faktor yang mempengaruhi jumlah produk yang dihasilkan, salah satunya adalah pelannya putaran rotary valve yang menyebabkan pengumpanan yellow cake menjadi sedikit.
Kata kunci : crushing, sieving, yellow cake
Abstrack
The Pilot Conversion Plant (PCP) is the installation productions of UO2 powder from yellow cake powder. At the beginning of the process of the refinery and conversion installation of yellow cake, raw material used is still a solid rock that comes from the mine. To be processed until can produce UO2 powder, so yellow cake rock needs to go through crushing and sieving until its powder particle has a size ≤ 5 mm .This yellow cake will be crushing and sieving in section 100 on refinery Installation and conversion (PCP). The all process is done in the Glove box (GB-101) to prevent areal contamination. The pressure inside the glove box is maintained at the level of between -5 mmH2O to -15 mmH2O of used pressure switch pneumatic to fulfil safety requirement suitable at limit of operating conditions (BKO). The crushing of yellow cake at section 100 uses Jaw Crusher (FC-101) and sieving uses vibrosieve (V-101). The resulting fine this process is yellow cake powder with size until ≤ 5 mm and ready to be dissolved with concentrated nitric acid in section 300. An observation on the operation process of yellow cake crushing and sieving tools, that there are several factors that influence the amount of product produced, one of which is the rotary valve rotation too slow that causes yellow cake feeding to be less. Keywords: crushing, sieving, yellow cake

Item Type: Article
Subjects: Taksonomi BATAN > Daur Bahan Bakar Nuklir dan Bahan Maju > Bahan Bakar Nuklir > Operasi dan Pemeliharaan Instalasi Bahan Bakar Nuklir
Taksonomi BATAN > Daur Bahan Bakar Nuklir dan Bahan Maju > Bahan Bakar Nuklir > Operasi dan Pemeliharaan Instalasi Bahan Bakar Nuklir
Divisions: BATAN > Pusat Teknologi Bahan Bakar Nuklir
IPTEK > BATAN > Pusat Teknologi Bahan Bakar Nuklir
Depositing User: Administrator Repository
Date Deposited: 13 Nov 2018 03:54
Last Modified: 02 Jun 2022 03:17
URI: https://karya.brin.go.id/id/eprint/4538

Actions (login required)

View Item
View Item