EVALUASI KONDISI PIPA-PIPA ALAT PENUKAR PANAS JE01 BC02 REAKTOR GA SIWABESSY PASCA INSPEKSI

santosa pujiarta, sp and Solehudin, Dede and Syafrul, Syafrul and Aep Saepudin Catur, ASC (2013) EVALUASI KONDISI PIPA-PIPA ALAT PENUKAR PANAS JE01 BC02 REAKTOR GA SIWABESSY PASCA INSPEKSI. PROSIDING SEMINAR NASIONAL TEKNOLOGI DAN APLIKASI REAKTOR NUKLIR. ISSN 978-979-17109-8-5

[thumbnail of 21_santosa.pdf]
Preview
Text
21_santosa.pdf

Download (690kB) | Preview

Abstract

EVALUASI KONDISI PIPA-PIPA ALAT PENUKAR PANAS JE01 BC02 REAKTOR GA SIWABESSY PASCA INSPEKSI. Telah dilakukan evaluasi hasil inspeksi/ pemeriksaan pipa-pipa alat penukar panas JE01 BC02 reaktor GA Siwabessy (RSG-GAS) dengan tujuan untuk menentukan tindak lanjut atas kondisi pipa-pipa (tubes) terperiksa dan menjamin bahwa peralatan penukar panas dapat dioperasikan dengan aman. Pemeriksaan dilakukan dengan uji tak merusak (NDT) menggunakan metode arus pusar (Eddy Current). Hasil evaluasi menyatakan beberapa tube perlu mendapatkan perhatian pada pemeriksaan berikutnya, meskipun prosentasenya masih sangat kecil kira-kira 10 %, yaitu pada tube yang mengalami cacat penipisan dan cacat cekungan. Hasil pengukuran ini masih dipengaruhi oleh adanya kotoran yang menempel pada dinding pipa sehingga hasil pengukuran menjadi kurang akurat. Beberapa pipa mengalami penyempitan oleh kerak atau sediment Kerak terbentuk akibat dari kualitas air pendingin sekunder yang kurang baik dan sistem bola pembersih pipa tidak berfungsi secara maksimal, Setelah kerak yang menempel dibersihkan, pipa-pipa penukar panas dapat difungsikan kembali. Alat penukar panas reaktor GA. Siwabessy masih berada dalam batas dan kondisi yang aman untuk dipergunakan hingga 5 tahun yang akan datang, sampai pada pemeriksaan berikutnya.
Kata kunci : Pipa-pipa, Alat penukar panas, Eddy Current
ABSTRACT
EVALUATION OF HEALTHINESS OF THE HEAT EXCHANGER TUBE OF JE01 BC02 INSTALLED AT THE GA. SIWABESSY REACTOR AFTER INSPECTION. Evaluation of healthiness of the heat exchanger tube of JE01 BC02 installed at the GA. Siwabessy reactor after inspection has been conducted. Purpose of this measure is to determine the corrective action, if any, of the tubes examinee and to ensure that the heat exchanger can be operated safely. Examination was conducted by the non-destructive testing (NDT) of Eddy Current methods. The evaluation results reveal that some heat exchanger tubes encountered minor wall thinning of approximately 10 % and dent defect. Attention should be taken in the next examination. It is deemed that the results may still be influenced by the presence of impurities deposited on the pipe wall causing improper measurement results. Some pipes experiencing constringency by a scale or sediment at which it is formed due poor quality of secondary cooling water and due cleaning system tubes ball malfunction. In order to refunctioning the tubes, a corrective action by cleaning the all suspected tubes have been take. Evaluation from the all measures implemented can be recognized that the heat exchanger is still safe be used up to 5 years or until the next inspection .
Key word : Tubes, Heat exchanger, Eddy Current

Item Type: Article
Subjects: Taksonomi BATAN > Reaktor Nuklir > Teknologi Reaktor > Instrumentasi dan Kendali Reaktor
Taksonomi BATAN > Reaktor Nuklir > Teknologi Reaktor > Instrumentasi dan Kendali Reaktor
Divisions: BATAN > Pusat Reaktor Serba Guna
IPTEK > BATAN > Pusat Reaktor Serba Guna
Depositing User: Administrator Repository
Date Deposited: 30 Oct 2018 07:24
Last Modified: 31 May 2022 09:16
URI: https://karya.brin.go.id/id/eprint/4202

Actions (login required)

View Item
View Item