Koes Indrakoesoema, KI and Andriyanto, Yayan (2013) ANALISA PEMASANGAN KAPASITOR BANK DAN REAKTOR PADA JALUR 3 (BHC) RSG – GA. SIWABESSY. PROSIDING SEMINAR NASIONAL TEKNOLOGI DAN APLIKASI REAKTOR NUKLIR. ISSN 978-979-17109-8-5
9_Koes.pdf
Download (880kB) | Preview
Abstract
ANALISA PEMASANGAN KAPASITOR BANK DAN REAKTOR PADA JALUR 3 (BHC) RSG GA SIWABESSY. Gedung Pusat Reaktor Serba Guna (PRSG) (Gedung 30 dan 31) mendapat catu daya tersendiri dan diperoleh melalui kontrak daya dengan PT PLN sebesar 3030 kVA. Penggunaan daya listrik pada ke dua gedung tersebut melalui 3 buah busbar utama melalui 3 buah transformator yang berbeda, dimana kapasitas masing-masing transformator adalah 1600 kVA. Jalur BHC dilayani oleh transformator basah (BHT03), berpendingin minyak. Beban induktif sangat dominan di PRSG sehingga penyerapan daya reaktif sangat besar (pemakaian kVAR yang besar) dan faktor daya menjadi rendah (≤0,85) yang berakibat terkena denda oleh PLN. Telah dilakukan pengukuran parameter listrik pada jalur 3 (BHC) dengan Power Quality Analyzer (PQA) HIOKI 3169-20 Clamp On Power HiTester pada sisi sekunder transformator BHT03 (400 V) yang dilakukan pada tanggal 16 – 17 Juli 2013. Daya maksimum terukur , P= 703,2 kW dan daya reaktifnya, Q= 451,3 kVAR. Diinginkan factor daya (cos φ) adalah 0,98, sehingga dibutuhkan kompensasi daya reaktif sebesar 308,49 kVAR. Untuk kompensasi daya reaktif ini dibutuhkan 7 unit kapasitor @ 50 kVAR. Total Harmonic Distortion (THD) yang timbul pada jalur BHC adalah TVDv = 2,04% dan THDi = 3,84%, sehingga masih di bawah standar IEEE Std.519-1992, yaitu 5% untuk tegangan dan 8% untuk arus. Dengan demikian tidak diperlukan pemasangan reaktor untuk melindungi kapasitor bank.
Kata kunci : Daya, kapasitor bank, reactor.
ABSTRACT.
ANALISYS OF CAPACITOR BANK AND REACTOR INSTALLATION ON LINE 3 (BHC) RSG GA SIWABESSY. Power supply for Multipurpose Reactor Center (PRSG) (Building No. 30 and 31) got from contracts with PT PLN for 3030 kVA. The use of electrical power on both building through the three (3) main busbar from three (3) different transformer, where the capacity of each transformer is 1600 kVA. BHC lines served by an oil cooled transformer (BHT03). Inductive load is very dominant in PRSG so very large absorption of reactive power (KVAR) and the power factor is low (≤ 0.85), which resulted in penalty by PLN. Measurements of electrical parameter have been done on line 3 (BHC) with Power Quality Analyzer (PQA) HIOKI 3169-20 Clamp On Power HiTester on the secondary side of the transformer BHT03 (400 V) which took place on 16 to 17 July 2013. Measured maximum power, P = 703.2 kW and reactive power, Q = 451.3 kVAR. Desired power factor (cos φ) is 0.98, so it is necessary reactive power compensation of 308.49 KVAR. For reactive power compensation is needed 7 units of capacitor @ 50 KVAR. Total Harmonic Distortion (THD) in line BHC is TVDv = 2.04% and THDi = 3.84%, so it is still below the IEEE Std.519-1992, which is 5% for voltage and 8% for current. Thus does not necessary to installation of reactor to protect the capacitor banks.
Key words : Power, capacitor bank, reactor.
Item Type: | Article |
---|---|
Subjects: | Taksonomi BATAN > Reaktor Nuklir > Teknologi Reaktor > Instrumentasi dan Kendali Reaktor Taksonomi BATAN > Reaktor Nuklir > Teknologi Reaktor > Instrumentasi dan Kendali Reaktor |
Divisions: | BATAN > Pusat Reaktor Serba Guna IPTEK > BATAN > Pusat Reaktor Serba Guna |
Depositing User: | Administrator Repository |
Date Deposited: | 30 Oct 2018 07:18 |
Last Modified: | 31 May 2022 09:13 |
URI: | https://karya.brin.go.id/id/eprint/4200 |