Edison, Edison and Sujarwono, Sujarwono and Agung Satrio, AS and Purwadi, Purwadi (2016) IMPLEMENTASI MISI PRSG DALAM MANAJEMEN KEGIATAN BIDANG PEMELIHARAAN REAKTOR. Prosiding Seminar Nasional Teknologi dan Aplikasi Reaktor Nuklir. ISSN 976-602-6423-00-9
21-EDISON.pdf
Download (481kB) | Preview
Abstract
IMPLEMENTASI MISI PUSAT REAKTOR SERBA GUNA DALAM MANAJEMEN KEGIATAN BIDANG PEMELIHARAAN REAKTOR. Misi PRSG yang berkaitan dengan tugas dan fungsi Bidang Pemeliharaan Reaktor adalah meningkatkan keandalan Operasi RSG-GAS dan menjamin keselamatan secara berkelanjutan. Misi ini harus terimplementasi dalam perencanaa, pelaksanaan dan evaluasi kegiatan perawatan. Akhir-akhir ini permasalahan yang menonjol dalam perawatan reaktor adalah besarnya jumlah scram tak terencana yang melebihi batas yang diharapkan, yaitu lebih kecil dari lima kali setahun. Oleh karena itu, selain kegiatan rutin tahunan, PRSG khususnya BPR menambahkan program untuk mengurangi jumlah scram tak terencana ini. Strategi untuk mencapai tujuan ini dilakukan dengan memanfaatkan kekuatan dan memperbaiki kelemahan sumber daya yang ada. Meskipun langkah-langkah kegiatan untuk menyelesaikan masalah ini belum tuntas, dari data terbaru didapati bahwa modifikasi rentang input kanal pengukur fluks neutron daerah daya JKT03 CX821 dan CX811 berkontribusi pada pengurangan jumlah scram. Penyelesaian menyeluruh dilanjutkan dengan perbaikan mekanisme penggerak batang kendali yang terindikasi merupakan penyebab lain dari scram tidak terencana.
Kata kunci: Misi, scram, fluks neutron
ABSTRACT
Missions of THE CENTER FOR MULTI PURPOSE REACTOR, PRSG IN THE VIEW OF THE MAINTENANCE DIVISION MANAGEMENT. The Maintenance Division is to improve operation reliability and to ensure continuously safe operation. This mission should be implemented in planning, realization and evaluation of maintenance activities. The dominant problem in reactor maintenance recently has been the number of unplanned scram which exceeded the expected number, that is less than five time a year. Consequently, in addition to yearly routine activities, PRSG especially BPR add a program to reduce the number of the unplanned scrams. The strategies to achieve this goal have been performed by benefitted the power and to improve the weaknesses of resources. Even though steps of the activities to solve the problems have not finished, based on latest data it was founded that the modification of the input range of power range measuring channels JKT03 CX821 and CX811 have contributed to reduce the number of scrams. The whole solving of the problem is to be continued by repairing the control rod drive mechanism which is indicated to be the other cause of the unplanned scrams.
Key words: Mission, Scram, flux neutron
Item Type: | Article |
---|---|
Subjects: | Taksonomi BATAN > Reaktor Nuklir > Operasi dan Pemeliharaan Reaktor > Pemeliharaan Taksonomi BATAN > Reaktor Nuklir > Operasi dan Pemeliharaan Reaktor > Pemeliharaan |
Divisions: | BATAN > Pusat Reaktor Serba Guna IPTEK > BATAN > Pusat Reaktor Serba Guna |
Depositing User: | Administrator Repository |
Date Deposited: | 29 Oct 2018 08:52 |
Last Modified: | 31 May 2022 04:43 |
URI: | https://karya.brin.go.id/id/eprint/4141 |