PEMUATAN DUMMY ALUMUNIUM UNTUK MENAMBAH ENERGI TERBANGKITKAN DI REAKTOR RSG-GAS

Sutrisno, Sutrisno and Amril, Amril and Asnul Sufmawan, AS and Purwadi, Purwadi (2015) PEMUATAN DUMMY ALUMUNIUM UNTUK MENAMBAH ENERGI TERBANGKITKAN DI REAKTOR RSG-GAS. PROSIDING SEMINAR NASIONAL TEKNOLOGI DAN APLIKASI REAKTOR NUKLIR. ISSN 978-979-8500-67-1

[thumbnail of 18-sutrisno_fix 113-115.pdf]
Preview
Text
18-sutrisno_fix 113-115.pdf

Download (366kB) | Preview

Abstract

PEMUATAN DUMMY ALUMUNIUM UNTUK MENAMBAH ENERGI TERBANGKITKAN DI REAKTOR RSG-GAS. Total energy terbangkitkan setiap siklus adalah mendekati 650 MWD, akan tetapi pada teras 86 akhir siklus posisi batang kendali bank 595 mm, Reg Rod = 595 mm (hampir mendekati maksimium 600 mm), namun total energi yang terbangkitkan baru 594 MWD. Untuk menaikkan total energi, diperlukan kompensasi batang kendali supaya reaktor tetap bisa beroperasi 15 MW dan energi yang terbangkitkan mendekati 650 MWD, maka diperlukan bahan kompensasi yang mempunyai harga reaktivitas positif. Kompensasi tersebut menggunakan batu topas yang dimasukkan dalam kapsul seberat 1,5 Kg yang dimuatkan pada 4 buah posisi Irradiation Position (IP) yaitu B-6, D-9, E-4 dan G-7. Karena kebijakan pimpinan dimana pada teras 87 target topas tidak diijinkan diiradiasi sehingga diperlukan pengganti yaitu Alumunium pejal yang mempunyai harga reaktivitas positif. Pemuatan dummy Alumunium pejal telah dilakukan dengan menambah setiap posisi IP, dengan dimensi diameter 47 mm dan tebal 50 mm masing-masing sebanyak 11 buah. Dari penambahan dummy Aluminium tersebut total energy yang terbangkitkan sebesar 626 MWD dan posisi batang kendali all bank 522 mm.
Kata kunci: dummy, aluminium, energi terbangkitkan, reaktor, reaktivitas.
ABSTRACT
LOADING OF DUMMY ALUMINUM TO INCREASE ENERGY IN RSG-GAS REACTOR. At this time the RSG-GAS reactor have a total of 40 fuel elements and control elements 8 with the meat uranium density is 2.96 g / cm3. The aim is that energy is awakened approaching 650 MWD, on the core 86 at the end of cycle, bank control rod position 595 mm, Reg Rod = 595 mm, but the total energy is awakened new 594 MWD. To raise the total energy, required compensation reactor control rods that can still operate 15 MW and energy is awakened approaching 650 MWD, the necessary material compensation that has positive reactivity price. On the terrace 87 targets irradiated topaz is not permitted so that the necessary replacement of solid aluminum which has a positive reactivity price. Loading dummy solid aluminum has been done by adding any IP position, with dimensions of 47 mm diameter and 50 mm thickness respectively of 11 pieces. Aluminium from dummy adding the total energy that is aroused by 626 MWD and the position of the control rod all the banks 522 mm.
Keywords: dummy, aluminum, energy, reactors, reactivity.

Item Type: Article
Subjects: Taksonomi BATAN > Reaktor Nuklir > Pemanfaatan Reaktor > Pembangkitan Listrik Reaktor Daya
Taksonomi BATAN > Reaktor Nuklir > Pemanfaatan Reaktor > Pembangkitan Listrik Reaktor Daya
Divisions: BATAN > Pusat Reaktor Serba Guna
IPTEK > BATAN > Pusat Reaktor Serba Guna
Depositing User: Administrator Repository
Date Deposited: 29 Oct 2018 03:46
Last Modified: 31 May 2022 04:54
URI: https://karya.brin.go.id/id/eprint/4092

Actions (login required)

View Item
View Item