EVALUASI KEGAGALAN CHILLER PENYEDIA AIR DINGIN QKJ 01/02/03 SETELAH BEROPERASI 24 TAHUN

Djunaidi, Djunaidi and Aep Saepudin Catur, ASC and Amril, Amril (2012) EVALUASI KEGAGALAN CHILLER PENYEDIA AIR DINGIN QKJ 01/02/03 SETELAH BEROPERASI 24 TAHUN. PROSIDING SEMINAR NASIONAL TEKNOLOGI DAN APLIKASI REAKTOR NUKLIR. ISSN 978-979-17109-7-8

[thumbnail of Djunaedi_252.pdf]
Preview
Text
Djunaedi_252.pdf

Download (3MB) | Preview

Abstract

EVALUASI KEGAGALAN CHILLER PENYEDIA AIR DINGIN QKJ 01102/03 SETELAH
BEROPERASI 24 TAHUN. Unit penyedia air dingin sistem ventilasi (CWU) RSG yang sering mengalami gangguan operasi adalah QKJ-01/02/03. Masing-masing memiliki 2 sirkuit A dan B yang bekerja terus 24 jamlhari secara bergantian. Mengingat umur operasi yang sudah lama maka sistem ini sangat rawan terhadap kerusakan dan perlu dievaluasi. Tujuan evaluasi chiller adalah untuk mengidentifikasi dan menentukan tindak lanjut perbaikan atas komponen-komponen penyusun chiller, yang terdiri dari kondensor, exhaust fan. kompresor, katup ekspansi, saringan refigeran (filter driyer), dan juga komponen pendukung yang bekerja bersama-sama. Dengan mengevaluasi data gangguan dimulai tahun 2007 - 2011 diketahui bahwa rata-rata 2 kali dalam sebulan terjadi kerusakan dan waktu perbaikan dan uji fungsi minimum 3 hari, oleh karena itu dilihat dari waktu perbaikan sudah dipertimbangkan tidak efisien lagi untuk dilakukan perbaikan ditambah dengan faktor biaya dan tersedianya tenaga kerja. Dapat disimpulkan bahwa system pengkabelan QKJ01/ 02/03 harus diganti total dan untuk mengatasi gangguan mekanik, QKJ-20 dan QKJ-30 harus diganti secara menyeluruh dengan yang baru. Untuk QKJ-lO masih bisa dipertahankan, karena kondisinya layak operasi dan gangguan mekanik sangat sedikit.

Kata kunci :Penyedia air dingin QKJ 01102/03

ABSTRACT
EVALUATION ON DISTURBANCES OF CHILLER COLD WATER SUPPLY QKJ 01/02/03 AFTER
OPERATING 24 YEARS. Cold water supply unit of the RSG-GAS ventilation system (CWU) currently
encountered various disturbances is QKJ-Ol/02/03 .. Each of them having two circuits A and B working 24 hours interchangeably Due to long operation, it is very crucial to evaluate system's performance. Then
purpose of the evaluation is to identify and determine follow up action and maintenance of chiller
components including condensors, exhaust fan, compressor, expansion valves, filter driyer and also its
supporting system. By evaluating on disturbances occurred in year 2007 to year 20// then it is reocnized
that in average monthly disturbances and failures occur 2 times at which they spend at least 3 days to
repaire and to do function test. Therefore it is deemed that maintain and repair are not effective and valid
anymore duefinance and man power also contributed to the success operation. Then it can be concluded that cabling on QKJ - 0//02/03 should be replaced totally and to handle mechanical disturbances ofQKJ-20 and QKJ-30 their entire components should also be changed with a new one while QKJ-/O is still in good condition.

Key world: chiller water unit QKJ 0J/02/03

Item Type: Article
Subjects: Taksonomi BATAN > Reaktor Nuklir > Operasi dan Pemeliharaan Reaktor > Operasi
Taksonomi BATAN > Reaktor Nuklir > Operasi dan Pemeliharaan Reaktor > Operasi
Divisions: BATAN > Pusat Reaktor Serba Guna
IPTEK > BATAN > Pusat Reaktor Serba Guna
Depositing User: Administrator Repository
Date Deposited: 25 Oct 2018 07:29
Last Modified: 31 May 2022 09:21
URI: https://karya.brin.go.id/id/eprint/4058

Actions (login required)

View Item
View Item