EVALUASI OPERASI REAKTOR G.A SIWABESSY SIKLUS OPERAS I 77

Purwadi, Purwadi (2012) EVALUASI OPERASI REAKTOR G.A SIWABESSY SIKLUS OPERAS I 77. PROSIDING SEMINAR NASIONAL TEKNOLOGI DAN APLIKASI REAKTOR NUKLIR. ISSN 978-979-17109-7-8

[thumbnail of Purwadi_239.pdf]
Preview
Text
Purwadi_239.pdf

Download (3MB) | Preview

Abstract

EVALUASI OPERASI REAKTOR GA. SIWABESSY SIKLUS OPERASI 77. Operasi reaktor GA
Siwabessy siklus operasi 77 berlangsung mulai tanggal 30 Nopember 2011 sid 06 Maret 2012. Sebagai bahan masukan untuk kelancaran dan keselamatan operasi reaktor berikutnya perlu dilakukan evaluasi terhadap operasi reaktor sebelumnya. Evaluasi dilakukan melalui studi literatur, pengumpulan data, pembahasan dan analisis terhadap jalannya operasi reaktor, mulai dari pembentukan konfigurasi teras, operasi daya rendah, operasi daya tinggi, pemanfaatan reaktor, serta gangguan-gangguan yang timbul pada saat pengoperasian reaktor. Operasi reaktor siklus 17 telah dioperasikan dengan energi sebesar 654,0094 MWD, digunakan untuk melayani iradiasi sebanyak 53 targetlsarnpel, penyediaan neutron tabung berkas PTBIN, dan pewarnaan batu topaz sebanyak ±447 kg. Gangguan scram/penurunan daya terjadi 4 kali dan gangguan yang teIjadi pada sistem bantu reaktor sebanyak 49 kali, namun hampir semua gangguan tersebut dapat diatasi. Secara keseluruhan dapat disimpulkan bahwa meskipun terjadi beberapa gangguan, operasi reaktor RSG-GAS siklus operasi 77 berlangsung dengan selamat sesuai dengan target yang ditetapkan.

Kata kunci: operasi, reaktor, siklus

ABSTRACT
EVALUATION OF THE GA SIWABESSY REACTOR OPERATION FOR 7th CYCLE. The operation of
reactor RSG-GAS for 7th cycle is conducted from November 30, 2011 to March 06, 2012. Evaluation result is
used as afeedback to improve the next reactor operation cycle. It is accomplished through literature assessment,
data collection, discussion and analysis of reactor operation commencing from the reactor core configuration,
operation of low power, reactor power operation, reactor utilization and experiences on disturbance appear
during reactor operation, . The reactor operation for 7thcycle has been achieved by developing power of 654,
0094 MWD and it was utilized for 53 samples irradiation, neutron beam services to PTBIN and topaz colouring
on 447 kg. Scram occurred 4 times and disturbance at auxiliary system occurred 49 times. All disturbances have
been successfully solved It then can be concluckd that the reactor operationfor 7th cycle 77 is running well as
expected

Key word: operation, reactor, cycle

Item Type: Article
Subjects: Taksonomi BATAN > Reaktor Nuklir > Operasi dan Pemeliharaan Reaktor > Operasi
Taksonomi BATAN > Reaktor Nuklir > Operasi dan Pemeliharaan Reaktor > Operasi
Divisions: BATAN > Pusat Reaktor Serba Guna
IPTEK > BATAN > Pusat Reaktor Serba Guna
Depositing User: Administrator Repository
Date Deposited: 25 Oct 2018 07:25
Last Modified: 31 May 2022 09:21
URI: https://karya.brin.go.id/id/eprint/4057

Actions (login required)

View Item
View Item