Koes Indrakoesoema, KI and Sujarwono, Sujarwono (1998) KATUP ISOLASI PENUKAR PANAS (PA-Ol/O2 AAO22) SAAT CATU DAYA PLN GAGAL. PROSIDING SEMINAR HASIL PENELITIAN PRSG. pp. 198-203. ISSN 0854-5278
0184.pdf
Download (674kB) | Preview
Abstract
ABSTRAK
MODIFIKASI PROGRA SIMATIC S-5 UNTUK PENUTUPAN KAT UP ISOLASI PENUKAR PANAS (PA-OI/O2 AAO22 SAAT CATU DAYA PLN GAGAL.
Untuk mengoperasikan sistem pendingin sekunder diperlukan tekanan yang cukup untuk mempertahankan air pendinginp ada Penukar Panas( Heat Exchanger).Tekanan tersebut diperlukan agar air sepanjang pipa dan pada HE tidak kosong dimana berlaku 'interlocking' bila tekanan lebih kecil dari 0,8 bar, pompa tidak dapat dihidupkan. Untuk menjaga tekanan tersebut,terdpat katup AA022. Agar motor katup tetap mempunyai tegangan apabila PLN mati, dibuat catu daya tambahan yang diambil dari UPS, dimana modi[Ikasi progranmya bekerja secara otomatis memindah catu daya dari PLN ke UPS. Dengan modifikasi program ini, katup dapat tertutup sehingga tekanan dapat dipertahankan konstan dan pompa dapat segera dioperasikan bila catu daya PLN normal kembali. Uji coba tambahan program dengan simulasi telah dilakukan dan telah berhasil mensimulasikan keadaan penutup katup.
ABSTRACT
MODIFICATION PROG M SIMAllC S-5 FOR CLOSING ISOLATION VALVE OF HEAT
EXCHANGER (PA-Ol/02 022) DURING POWER SUPPLY FROM PLN FAILURE. In routine
operation,t he secondaryc oo ing pump systemn eed a sufficient pressurei n the heat exchangers.T his
pressure is needed to start the pumps, where if the setting pressure less than 0.8 bar, the interlock system
not allows to start the pump. To hold the coolant in HEs and in the lower stream pipings, the motor
valves PA-OI/02 AA022 are rovided at the upper stream of the cooling tower for both cooling units.
Power supply for motor valve comes from PLN and when at loss of power supply, the pumps stop just as
all valves on the flow lines ke to open. To hold the power supply for motor valves, supply of the motors
are connectedto UPS and the Simaticp rogram is automaticallyc hanget he supply from PLN to UPS for
closing the valves. The expe. ent of program simulation has been done with the result the valves are
closed.
Item Type: | Article |
---|---|
Subjects: | Taksonomi BATAN > Reaktor Nuklir > Teknologi Reaktor > Sistem Reaktor Taksonomi BATAN > Reaktor Nuklir > Teknologi Reaktor > Sistem Reaktor |
Divisions: | BATAN > Pusat Reaktor Serba Guna IPTEK > BATAN > Pusat Reaktor Serba Guna |
Depositing User: | Administrator Repository |
Date Deposited: | 27 Jul 2018 04:10 |
Last Modified: | 02 Jun 2022 02:45 |
URI: | https://karya.brin.go.id/id/eprint/3506 |