Sriyono, SR and Rahayu Kusumastuti, RK and Syaiful Bakhri, SB and Geni Rina Sunaryo, GRS (2017) Analysis of helium purification system capability during water ingress accident in RDE. In: International Conference on Nuclear Technologies and Sciences (ICoNETS 2017), 12 Oktober 2017, Makasar - Sulawesi Selatan - Indonesia.
Full text not available from this repository.Abstract
Abstract
The water ingress accident caused by steam generator tube rupture (SGTR) in RDE (Experimental Power Reactor) must be anticipated. During the accident, steam from secondary system diffused and mixed with helium gas in the primary coolant. To avoid graphite corrosion in the core, steam will be removed by Helium purification system (HPS). There are two trains in HPS, first train for normal operation and the second for the regeneration and accident. The second train is responsible to clean the coolant during accident condition. The second train is equipped with additional component, i.e. water cooler, post accident blower, and water separator to remove this mixture gas. During water ingress, the water release from rupture tube is mixed with helium gas. The water cooler acts as a steam condenser, where the steam will be separated by water separator from the helium gas. This paper analyses capability of HPS during water ingress accident. The goal of the research is to determine the time consumed by HPS to remove the total amount of water ingress. The method used is modelling and simulation of the HPS by using ChemCAD software. The BDBA and DBA scenarios will be simulated. In BDBA scenario, up to 110 kg of water is assumed to infiltrate to primary coolant while DBA is up to 35 kg. By using ChemCAD simulation, the second train will purify steam ingress maximum in 0.5 hours. The HPS of RDE has a capability to anticipate the water ingress accident.
Item Type: | Conference or Workshop Item (Paper) |
---|---|
Subjects: | Taksonomi BATAN > Keselamatan dan Keamanan Nuklir Taksonomi BATAN > Keselamatan dan Keamanan Nuklir |
Divisions: | BATAN > Pusat Teknologi dan Keselamatan Reaktor Nuklir IPTEK > BATAN > Pusat Teknologi dan Keselamatan Reaktor Nuklir |
Depositing User: | Administrator Repository |
Date Deposited: | 09 May 2018 08:25 |
Last Modified: | 31 May 2022 04:36 |
URI: | https://karya.brin.go.id/id/eprint/1291 |