Tjipta Suhaemi, TS and Djendjen Zainal, DZ and M. Hadi Kusuma, MHK and syafaruddin, syafaruddin and itjeu karliana, IK and Hendro Tjahjono, HT (2005) EVALUASI KESELAMATAN REAKTOR KARTINI DITINJAU DARI ASPEK CATU DAYA (Tjipta Suhaemi, Djen Djen, M. Hadi K, Syafarudin,Itjeu K, Hendro Tjahyono). In: Prosiding Presentasi Ilmiah Teknologi Keselamatan Nuklir X ISSN No. 1410-0533, 26 Pebruari 2005, Pusat Teknologi dan Keselamatan Reaktor Nuklir.
Full text not available from this repository.Abstract
ABSTRAK
EVALUASI KESELAMATAN REAKTOR KARTINI DITINJAU DARI ASPEK CATU DAYA. Telah dilakukan evaluasi keselamatan reaktor Kartini ditinjau dari aspek catu daya. Sistem catu daya berfungsi untuk menyediakan daya listrik yang diperlukan untuk mengoperasikan peralatan sistem kontrol dan sistem proteksi maupun sistem lain. Penyediaan daya listrik untuk suatu beban harus mempunyai keandalan yang tinggi. Kebutuhan listrik untuk reaktor Kartni pada keadaan normal disediakan dari gardu listrik/PLN, sedangkan pada keadaan darurat seluruh beban dilayani oleh diesel gen-set 100 KVA yang berada di ruang diesel. Tersedia dua buah genset di ruang diesel. Pelayanan diesel dapat dilakukan dalam waktu kurang lebih 25 menit dihitung dari matinya listrik PLN, selang waktu tersebut bisa dipercepat menjadi 15 menit. Dari data operasi selama tahun 2003, diperoleh data listrik PLN mati sebanyak 4 kali, 49 hari operasi dengan jumlah jam operasi sebanyak 10068 menit = 167,8 jam. Dari perhitungan diperoleh keandalan dari sistem catu daya reaktor Kartini sebesar 97,63%. Dari aspek sistem pengaman, terlihat bahwa reaktor Kartini telah memenuhipersyaratan dengan digunakannya kabel jenis NYFGbY dan tahanan pentanah yang besarnya kurang dari 2 ohm. Untuk melindungi gedung reaktor digunakan penangkal petir yang sesuai dan mengikuti Peraturan Umum Instalasi Listrik.
ABSTRACT
SAFETY EVALUATION OF KARTINI REACTOR BASED ON ELECTRIC SUPPLY SYSTEM. The safety evaluation of Kartini reactor has been evaluated based on the electrical supply system. The electrical supply system functioned to provide enough power for control system, protection system, andother auxiliary system. Electrical supply should be in suitable quality and high reliability.In the normal operation the power of Kartini reactor is supplied by electricity from transformer station of PLN., while in the emergency operation the power is provided by diesel generator. There are two diesel generators available in diesel house i.e Mercedes Benz generator of 100 kVA and Mielex generator of 100 kVA. Emergency generator can be supplied in 15 minutes and can be fastened up to 15 minutes. Fromoperation data on 2003, it is known that the unavailability of electricity from the PLN is 4 times or 10068 minutes. It is calculated that the reliability of electric supply system of Kartini reactor is 97.63 %. It is concluded that from safety aspect the Kartini reactor has followed the requirement by using cable type NYFGbY and grounding resistor less than 2 ohms. For assuring the building security, it is used the lighting protector that following the requirement and standard of General Requirements of Electrical Installation.
Item Type: | Conference or Workshop Item (Paper) |
---|---|
Subjects: | Taksonomi BATAN > Keselamatan dan Keamanan Nuklir Taksonomi BATAN > Keselamatan dan Keamanan Nuklir |
Divisions: | BATAN > Pusat Teknologi dan Keselamatan Reaktor Nuklir IPTEK > BATAN > Pusat Teknologi dan Keselamatan Reaktor Nuklir |
Depositing User: | Administrator Repository |
Date Deposited: | 11 May 2020 06:16 |
Last Modified: | 31 May 2022 03:46 |
URI: | https://karya.brin.go.id/id/eprint/9855 |