Link Budget Analisys Of National Payload Rocket Telemetry Competitionin Pamengpeuk Garut West Java

Agus Hendra Wahyudi and Yanuar Prabowo (2013) Link Budget Analisys Of National Payload Rocket Telemetry Competitionin Pamengpeuk Garut West Java. Proceedings SIPTEKGAN XVII-2013. pp. 272-275. ISSN 978-979-1458-74-0

[thumbnail of Prosiding_Agus Hendra_Pustekbang_2013.pdf]
Preview
Text
Prosiding_Agus Hendra_Pustekbang_2013.pdf

Download (235kB) | Preview

Abstract

Communication system on telemetry payload rocket competition has been built in order to transfer data between payload and the ground station. The transmitter and receiver frequencies were set up into 432.0325MHZ, 433.0325 MHZ, 434.0325 MHZ, and 435.0325 MHZ with their 20 dBmoutput power. Link budget analysis of this system show that the system would have 33 km maximum distance communication with the link margin value was 18 dB which 99% communication availability. It is quite enough for payload rocket competition at PamengpeukGarut West Java due to trajectory rocket predicted only as far as 1 km or below.

Item Type: Article
Uncontrolled Keywords: Telemetry, link budget, payload rocket
Subjects: Taksonomi LAPAN > Teknologi Penerbangan dan Antariksa > Pengelolaan Fasilitas Litbangyasa dan Pemanfaatan > Bidang Teknologi Roket
Divisions: LAPAN > Deputi Teknologi Penerbangan Dan Antariksa > Pusat Teknologi Penerbangan
Depositing User: Administrator Repository
Date Deposited: 23 Mar 2021 00:33
Last Modified: 14 Jul 2022 19:58
URI: https://karya.brin.go.id/id/eprint/10774

Actions (login required)

View Item
View Item